Cable Stay Bridge

Cable Stay Bridge

Cable Stayed Bridge – Berrinba Wetlands Project: 72 m cable stayed bridge Key Elements: Fabrication of the main  long-span bridge and four  pedestrian bridges ranging from 10 m to 25 m Project Details DWW Engineering completed the fabrication of a 72 m cable stayed...
Forest Pines Bridge

Forest Pines Bridge

Forest Pines Bridge Scope of Work: 27 m span steel cycle bridge Key Elements: Designed and fabricated to cross a 27 m creek bed, with abutment design, protective coatings and site installation Project Details DWW Engineering designed, fabricated and installed a 27 m x...
Pedestrian Bridge – Emerald

Pedestrian Bridge – Emerald

Pedestrian Bridge – Emerald Scope of Work: Design and fabricate a 22 m x 2 m  steel truss            pedestrian bridge Key Elements: Warren Truss design, timber deck, RPEQ                      certification and protective coating Project Details DWW Engineering...
Greenwood Grove Cycle Bridge | Steel Pedestrian Bridge

Greenwood Grove Cycle Bridge | Steel Pedestrian Bridge

Greenwood Grove Cycle Bridge Scope of Work: A 20 m x 2.5 m steel pedestrian bridge Key Elements: Design, fabricate, coat and install (including                            abutments and water main provision) Project Details DWW Engineering delivered a full design and...
CityCat Ferry Terminal Upgrade | Marine Walkway

CityCat Ferry Terminal Upgrade | Marine Walkway

City Cat Ferry Terminal Upgrade Scope of Work: Fabrication of three new ferry terminals Key Elements: Structural aluminium truss with internal marine walkway; spans up to 26 m (35+ tonnes) Project Details DWW Engineering fabricated three new flood-resistant,...