• News
  • Contact
  • News
  • Contact
  • News
  • Contact

Cable Stayed Bridge – Berrinba Wetlands

Project: 72 m cable stayed bridge

Key Elements: Fabrication of the main                            long-span bridge and four pedestrian bridges        ranging from 10 m to 25 m

Project Details

DWW Engineering completed the fabrication of a 72 m cable stayed bridge for Berrinba Wetlands, along with four smaller pedestrian bridges ranging from 10 m to 25 m in length.

The main bridge required the fabrication of large structural components, towers and cable-supporting elements to suit the long-span design. The additional pedestrian bridges formed part of the wider access network through the wetlands, creating connected routes for community use.

View our capabilities for pedestrian and cycle bridges.

Highlights

  • 72 m cable stayed bridge fabricated for Berrinba Wetlands
  • Four additional pedestrian bridges supplied as part of the project
  • Smaller bridge spans ranging from 10 m to 25 m
  • Large structural components fabricated for the main long-span crossing
  • Coordinated bridge package supporting pedestrian access through the wetlands

Get in touch

Enquire today about your next project.