Project: 72 m cable stayed bridge
Key Elements: Fabrication of the main long-span bridge and four pedestrian bridges ranging from 10 m to 25 m
Project Details
DWW Engineering completed the fabrication of a 72 m cable stayed bridge for Berrinba Wetlands, along with four smaller pedestrian bridges ranging from 10 m to 25 m in length.
The main bridge required the fabrication of large structural components, towers and cable-supporting elements to suit the long-span design. The additional pedestrian bridges formed part of the wider access network through the wetlands, creating connected routes for community use.
View our capabilities for pedestrian and cycle bridges.
Highlights
- 72 m cable stayed bridge fabricated for Berrinba Wetlands
- Four additional pedestrian bridges supplied as part of the project
- Smaller bridge spans ranging from 10 m to 25 m
- Large structural components fabricated for the main long-span crossing
- Coordinated bridge package supporting pedestrian access through the wetlands