• News
  • Contact
  • News
  • Contact
  • News
  • Contact

Mining Grizzlies for Evolution Mining

Client: Evolution Mining

Location: Ernest Henry Mine

Scope: Fabrication & trial-assembly of 3 mining grizzlies

Assembled steel mining grizzly

Project Details

DWW Engineering recently completed the fabrication and trial assembly of three additional mining grizzlies for our long-standing client, Evolution Mining. These units were delivered as complete kits, ready for site installation, continuing a partnership built on reliability, problem-solving, and consistent performance in demanding environments.

 

Highlights

  • Long Term partner since 2019
  • 20 grizzlies delivered to date (see past projects)
  • Fully assembled and supplied with all components
  • Built for underground mine durability
Part of a mining grizzly in steel fabricator workshop in Brisbane
Part of a mining grizzly in steel fabricator workshop in Brisbane
Part of a mining grizzly in steel fabricator workshop in Brisbane
Part of a mining grizzly in steel fabricator workshop in Brisbane
Part of a mining grizzly in steel fabricator workshop in Brisbane
Part of a mining grizzly in steel fabricator workshop in Brisbane
Part of a mining grizzly in steel fabricator workshop in Brisbane
Part of a mining grizzly in steel fabricator workshop in Brisbane
Part of a mining grizzly in steel fabricator workshop in Brisbane

Get in touch

Enquire today about your next project.

The DWW Engineering office and workshop will be closed from 18/12/2025 to 05/01/2026 over the Christmas break.
This is default text for notification bar