Victoria Point Pedestrian Bridge
Scope of Work: A 25Mtr x 2Mtr Pedestrian bridge
Key Elements: To design, fabricate, paint and install

The scope of supply was to design, fabricate and install an 18mtr bridge spanning a creek bed to provide access to a new housing estate. As part of the scope we were asked to design and install the concrete abutment footing for the bridge landing.
This bridge is RPEQ certified to AS4100 and AS5100, built to a typical DWW in house ‘Warren Truss’ design. As DWW carried out the complete installation, we also provided the Forms 15 and 16 for these works.













