Lock Gates – Serenity Cove

Scope of Work: Fabricate new filtration tank

Key Elements:
Tight tolerance manufacture, corrosion protection coating, multi-interface installation

Project Details

DWW Engineering fabricated and installed steel lock gates for the Serenity Cove waterside housing estate on the Gold Coast. The lock gate system was designed to maintain water levels between a tide-affected river and the estate waterways, which meant fit-up and sealing tolerances were critical.

The project included multiple steel elements along with stainless steel components, specialist bushings and engineered rubber seals selected to suit the operating loads and corrosion conditions. We applied a protective surface coating system and completed installation on site, coordinating interfaces across the gate structure, drives and civil components.

View our capabilities for marine steel fabrication.

Highlights

  • Steel lock gates fabricated and installed for Serenity Cove water level control
  • Tight tolerance manufacture to achieve reliable watertight sealing
  • Surface coating specified for high-corrosion marine conditions
  • Installed on site with multiple component interfaces and alignment requirements
  • Included stainless steel components, engineered rubber seals and specialist bushing materials