• News
  • Contact
  • News
  • Contact
  • News
  • Contact

Landsborough Cycle Bridge

Scope of Work: A 18Mtr x 1.8Mtr Cycle bridge

Key Elements: To design, fabricate, paint and install bridge including the design and installation of the concrete abutments

The scope of supply was to design, fabricate and install an 18mtr bridge spanning a creek bed to provide access to a new housing estate. As part of the scope we were asked to design and install the concrete abutment footing for the bridge landing.

This bridge is RPEQ certified to AS4100 and AS5100, built to a typical DWW in house ‘Warren Truss’ design. As DWW carried out the complete installation, we also provided the Forms 15 and 16 for these works.

Get in touch

Enquire today about your next project.

The DWW Engineering office and workshop will be closed from 18/12/2025 to 05/01/2026 over the Christmas break.
This is default text for notification bar